Hotel and Leisure

Twickenham

Oakwood Air Conditioning has completed a £450,000 air conditioning contract at the home of English rugby, Twickenham. Daikin VRV air conditioning has been installed in various areas of the East and West stands including the RFU’s club rooms, the Museum of Rugby, the Rugby Stores and the atmospheric ‘Spirit of Rugby’ Restaurant.

Additionally cooling coils have been installed in the existing fresh air supply air handling units. These cooling coils are served by a total of 11 large new Airedale condensing units. All the new equipment operates with ozone friendly refrigerants.

Consultants were En-Consult of Dunfermline.

Value: £450,000

Four Seasons Hotel, Hampshire

The prestigious Four Seasons Hotel at Dogmersfield, Hampshire is a Georgian Manor House situated in rolling countryside.

The Hotel is a project Oakwood got involved with at later stages and saw us project managing the site, supplying and installing all duct work and four pipe fan coils into the hotel.

On completion of this we were then asked to supply chillers, controls for the four pipe fan coil units and bespoke grilles to the pool, spa and dining areas.

In the kitchen Oakwood supplied and installed kitchen extract duct work and associated fans situated on the roof.

All areas of the project were completed on time and on budget.

The project value of The Four Seasons Hotel Hampshire was £1,050,000

Weybridge Health Club

Located just outside the town in an attractive riverside setting, luxurious Weybridge Health Club is the end result of a sympathetic renovation and extension of a former farmhouse and its outbuildings. Incorporating swimming pool, spa, gymnasia, fitness studios and creche, all the mechanical services except the pool water treatment plant were supplied and installed by Oakwood in a £330,000 contract.

Services include pool and spa ventilation systems, general ventilation to changing rooms and fitness rooms, comfort cooling to exercise areas, gas fired heating boilers and hot water plant, under-floor heating systems, water storage, Calor Gas system, all hot and cold water services and a full function automatic control system.

The project was completed on time and to budget and as a result we were successful with our tender for the subsequent maintenance contract.